MV Commissioning Engineer

August 1, 2025
Urgent

Job Description

BMSL are currently looking for MV Commissioning Engineers for work in the UK and Scandanavia please find a rough guide to the duties involved below.

Roles & Responsibilities

Able to lone working;

Work live and switch up to 1000V (up to 11/33KV preferable but not essential. If unable open to learning);

Enter a Switch Room and recognise if the Asset or Switch Room is safe to work in/on by proving dead through the safe isolation procedure;

Read and interoperate detailed RAMS;

Cross reference part numbers and identify reference/asset issues;

Perform manual handling activities to manoeuvre and final position switch panel sections into the desired room from delivery point;

Interoperate lifting plans from the delivery driver to set out safe restricted access zones;

Understand room setting out requirements & room layout plans;

Setting up the work site in terms of safety, access and where materials are kept;

Couple LV/MV switch panel sections panel together and fix to the floor;

Install and terminate control cabling;

Torque mechanical and electrical connections;

Critical Clean of LV & MV assets;

Receive Electrical Safety Document (permits);

Perform and record Dead Test results;

Perform Insulation resistance test;

Perform Flash test;

Perform Low Ohms resistance test;

Perform Secondary Injection test;

Perform Primary Injection test;

Configure protection device relay software;

Operate dead Air Circuit Breakers, MCCB’s and Fused Isolators for maintenance regimes;

Detailed understanding of overall HV/MV/LV/UPS/ Generator systems integration and fault finding;

Detailed understanding of overall HV/MV/LV/UPS/ Generator control systems and fault finding;

Basic MV/HV system and switching procedure understanding;

Understand, interoperate & troubleshoot Dead test results;

Produce technical and progress reports.

Isolate and apply earth up to and including 33KV (preferable but not essential. If unable open to learning);

Issue electrical limitations off access, sanction to test and permit to work safety documents (preferable but not essential. If unable open to learning);

Prepare Switching Schedules (preferable but not essential. If unable open to learning);

Perform AC test, DC test, VLF test (preferable but not essential. If unable open to learning);

Location